Friedrich Lindenberg friedrich.lindenberg at okfn.org
Mon May 16 16:03:43 UTC 2011


Hi Adria,


2011/5/16 Adrià Mercader <amercadero at gmail.com>:
> I was going through my tickets as told by David, and I moved this one
> (Harvest other data catalogues) to the next sprint.
> http://trac.ckan.org/ticket/985

I think we should have some way of grouping our tickets for this, not
sure if a seperate sprint is the way to go - what do others think? It
would give us a progress bar etc. which would definetly be good.

> I'm not sure if this should be included in the normal ckan iterations
> or we should create an specific milestone for publicdata.eu work?
> By the way, what do the 1d,2d in the ticket's description mean?

Those were estimates of the effort (days) required to scrape each.

- Friedrich